BOQ Management

Your bill of quantities, live on site.

Construction firms in Kenya spend weeks every month reconciling BOQ spreadsheets. Lobocon replaces that with a live tracker that updates as work happens — so you know where every shilling is going before the month ends.

3 wks

saved per project on BOQ reconciliation

942

line items tracked live across 16 bills

1

source of truth for your whole QS team

Element 1 — SubstructuresB-SUBALL PROVISIONAL

52 items · column bases, basement slab, waterproofing, reinforcement

CodeDescriptionQtyUnit
1.1.1Excavate to reduce levels; not exceeding 1.5m deep300m3
1.1.2Ditto; exceeding 1.5m but not exceeding 3.0m deep350m3
1.5.1Vibrated reinforced insitu concrete class 25MPa — Column bases14,000m3
1.8.1T8 high tension ribbed steel bars reinforcement to BS 444926,991Kg
1.4.1Allow for keeping the whole excavation free from all water1Item
Section TotalKES 48,230,000
Customer StoryHow Skyline Kenya cut BOQ reconciliation from 3 weeks to 2 days

Trusted by leading construction firms in Kenya

STANBUILD
SkylineKenya
MaishaConstruct
KensetsuLtd
HarbourageEA
BUILDSCAPE

The problem

Every QS team in Kenya is doing the same thing wrong.

It is not your fault. It is what the tools have forced you into.

Before Lobocon
  • xMultiple Excel files, one per trade. No single version anyone trusts.
  • xReconciliation only happens at month-end. By then the damage is already done.
  • xSite progress lives in WhatsApp messages. It never makes it back into the BOQ.
  • xClient wants an update and you spend half a day pulling numbers from three spreadsheets.
  • xVariation orders get lost or disputed because there is no audit trail.
With Lobocon
  • vOne BOQ shared across the whole team. QS, PM, foreman and client all see the same numbers.
  • vProgress updates as work is recorded on site. The BOQ is always current.
  • vImport your existing Excel BOQ in under an hour. No re-entering data.
  • vClient dashboard is live. No more weekly PDFs or status emails.
  • vEvery variation is logged with a timestamp. No disputes at final account.

What it does

Everything your QS team needs. Nothing it does not.

Import

Paste or upload your existing BOQ

Lobocon accepts Excel and Google Sheets BOQs directly. You map your columns once and the system builds your live tracker automatically. The contract sum is derived instantly — 942 items across 16 bills, parsed in seconds.

app.lobocon.co/projects/primark/setup

BOQ successfully imported

3 files · 16 bills · 942 items · KES 859,673,313 contract sum derived automatically

Project Setup Progress

1

Project Created

2

BOQ Imported

3

Configure Financial Settings

4

Invite Team

5

Project Live

What Was Detected

Provisional Sums

Civil BOQ — Bill VIII

KES 3,125,000

Included in total

No Contingency Detected

Management Reserve

Current Budget Summary

Contract Sum

859,673,313

Contingency

+ 0

Management Reserve

+ 0

Total Project Budget

859,673,313

Financial configuration

Cost baseline locks to your BOQ automatically

Set your contingency, management reserve, and cost baseline in one place. The live budget preview updates as you configure each item — so your finance team always sees the total project budget before you commit to anything.

app.lobocon.co/projects/primark/financial-setup

Financial Setup

Primark Apartments

Westlands, Nairobi — Primark Developments Ltd

Contract Sum

KES 859,673,313

16 bills · 302 sections · 942 items

Cost Baseline

Auto-sync baseline from BOQ

Current baseline

Auto-sync is on — updates with BOQ

KES 859,673,313

Last synced: just now

Contingency Allowance

No contingency was found in your BOQ. You can add a contingency percentage per bill or a global percentage across all bills.

Live Budget Preview

Contract Sum

Raw BOQ · 16 bills

859,673,313

Contingency

Not added

+ 0

Cost Plan / Baseline

Contract sum + contingency

859,673,313

Management Reserve

Not configured

+ 0

Total Project Budget

859,673,313

Live tracking

Track every line item against actual site progress

Site teams record daily progress against each BOQ code. The tracker updates in real time. Your QS sees exactly which items are on track, which are over-running, and where the margin risk is building — before it costs you.

app.lobocon.co/projects/primark/boq
Element 1 — SubstructuresB-SUBALL PROVISIONAL

52 items · column bases, basement slab, waterproofing, reinforcement

CodeDescriptionQtyUnit
1.1.1Excavate to reduce levels; not exceeding 1.5m deep300m3
1.1.2Ditto; exceeding 1.5m but not exceeding 3.0m deep350m3
1.5.1Vibrated reinforced insitu concrete class 25MPa — Column bases14,000m3
1.8.1T8 high tension ribbed steel bars reinforcement to BS 444926,991Kg
1.4.1Allow for keeping the whole excavation free from all water1Item
Section TotalKES 48,230,000
Role-based access

The right view for every person on your team

Your QS sees everything. Your foreman sees only progress entry. Your client sees a read-only dashboard. One platform, with permissions that match how your project is actually structured on site.

app.lobocon.co/projects/primark/team

Team Access — Primark Apartments

Role-based permissions · 4 members

JK

James Kariuki

Project Manager

Full Access
AO

Amina Osei

Quantity Surveyor

BOQ + Cost
SM

Samuel Mwita

Site Foreman

Progress only
C

Client View

Read-only dashboard

View only
Variation orders

Every variation logged with a full audit trail

Raise variations directly in Lobocon with a description, value, and approval status. The BOQ updates when approved. The full history is retained for final account — no more disputes about what was agreed and when.

app.lobocon.co/projects/primark/variations

Variation Orders

Primark Apartments · 3 active

VO-001

Additional ground beam due to unforeseen rock

14 Jan 2026

+KES 420,000Approved
VO-002

Client-instructed change to facade cladding spec

22 Jan 2026

+KES 1,240,000Pending
VO-003

Omission of ornamental pool from basement level

28 Jan 2026

-KES 380,000Rejected
Net variation impact+KES 1,280,000
Connected platform

BOQ progress feeds your cash flow automatically

When work reaches 62% completion your projected inflows update immediately. Your BOQ is not an island — it feeds earned value, cash flow forecasting, and your live project dashboard without you having to do anything extra.

app.lobocon.co/projects/primark/cash-flow

Cash Flow Forecast

Snapshot 13 Feb 2026 · Period 1 Feb – 28 Feb 2026

Healthy

Live — updating from BOQ progress at 62% completion

Total Cash In

KES 18,500,000

Cumulative

Cash In This Period

KES 3,200,000

Feb 2026

Total Cash Out

KES 14,300,000

Cumulative

Burn Rate (Daily)

KES 89,286

Per day

Opening BalanceKES 2,400,000
Closing BalanceKES 4,200,000
Projected Balance (30 days)KES 6,300,000

Customer Story

"BOQ alone saved 3 weeks per project. Our QS team finally does analysis, not spreadsheets."

Amina Osei

QS Lead, Skyline Kenya

Common questions

What Kenya-based QS teams ask us first.

If you have a question not listed here, email us at sales@lobocon.co

Can I import my existing Excel BOQ?

Yes. Lobocon accepts Excel and Google Sheets BOQs directly. You map your columns once during setup and the system builds your live tracker from your existing data. Most teams are up and running within an hour.

Does it work for NCA-format BOQs used in Kenya?

Yes. Lobocon supports the standard NCA bill format used by most Kenyan quantity surveyors. The code, description, quantity, and unit structure maps directly. If you use a custom format, the import tool handles that too.

How does site progress get into the system?

Site foremen log progress directly in Lobocon using a simplified mobile-friendly view. They only see their assigned work packages and enter a percentage or quantity done. The QS sees updates in real time without having to chase anyone.

What happens when there is a variation order?

Variations are raised directly in Lobocon with a description, value, and status. Approvals are tracked. The BOQ updates when the variation is approved and the full history is retained for final account.

Can our client see the BOQ?

You control what clients see. You can give them a read-only live dashboard that shows overall progress and financial position without exposing your internal cost breakdown. Most firms find this replaces the weekly progress meeting entirely.

Is Lobocon built for the Kenyan market specifically?

Yes. Lobocon is built in Kenya for construction firms in Kenya and East Africa. Currency defaults to KES, the BOQ format follows local QS convention, and the team understands how construction projects are structured and contracted in this market.

Stop reconciling at month-end.
Know now.

Book a working session with the Lobocon team. We will import your first BOQ with you and show you exactly how your QS workflow changes.

Book a session