Planned vs Actual

Planned 80 percent. Actual 72 percent. Know it on Monday, not at month end.

Site measures quantities against every BOQ item each week. Lobocon turns the measurement into earned value, progress and variance on the spot, ties it to the linked programme task, and locks the entry once the PM or QS verifies it for billing.

Planned vs Actual, Week 18

Block A superstructure, measured 22 Sep, verified 23 Sep

3 items
Concrete pours8 percent behind
Planned
80%Actual
72%
Block laying15 percent behind
Planned
60%Actual
45%
Steel fixingVerified4 percent ahead
Planned
55%Actual
59%

The problem

The weekly report is built from memory on Friday.

It is not the site's fault. It is what a spreadsheet forces a site into.

Today
  • The foreman sends photos on WhatsApp
  • The QS re-types quantities into Excel
  • Last week's cumulative is in another file
  • Nobody signs the number off before it is billed
With Lobocon
  • The site engineer enters the measured quantity per BOQ item for the week
  • Cumulative, earned value and percent complete are derived, not typed
  • The PM or QS verifies and the entry locks
  • The weekly report is a rollup, not a rewrite

What it does

Measure once. Everything updates.

Four things the module does with one number from site.

Measurement

Measure once, everything updates

Enter the quantity done this week against a BOQ item. Lobocon derives the cumulative quantity, this period's earned value, cumulative earned value and percent complete, and writes them back to the item. Contract quantity and rate are snapshotted on the entry, so history stays right even if the BOQ changes later.

1.1.2 Excavate exceeding 1.5 m, not exceeding 3.0 m

Week 18, 15 to 21 Sep, entered by K. Otieno, Site Agent

In progress
Measured this period134.24 m3
Cumulative223.24 of 360 m3
Contract rateKES 1,100
Earned this periodKES 147,664
Progress62%
Verification

Verified before it is billed

A measurement is a claim until the PM or QS verifies it. Verified entries lock, cannot be deleted, and carry the verifier's name, time and note. That is what goes into the interim certificate.

1.1.2 Excavate exceeding 1.5 m

Week 18

Verified, locked
Measured134.24 m3
Verified byA. Mwangi, QS
Verified at15 Sep, 11:48
NoteRe-measured with the RE on site
Cannot be deleted while verified
Budget against actual

Budget against actual at every level

Bill, section and item: budget, actual cost, variance, earned value and CPI, rolled up with progress weighted by value. Where a BOQ item is linked to a programme task, the task's recorded progress is used.

BillBudgetActualVarianceCPI
Bill 1, Earthworks48.2M41.6M+6.6M1.08
Bill 2, Pavement122.9M118.4M+4.5M1.02
Bill 4, Structures96.4M104.1M7.7M over0.93
Bill 7, Slope protection18.0M6.1Mnot startedn/a
Site conditions

The reason travels with the number

Every period carries site notes and site conditions. Heavy rain on days three and four is recorded against the week it slowed, not remembered at the claims meeting.

Week 18 conditions

Entered with the measurement

Heavy rains days 3 to 4, compaction delayed. Access road impassable Thursday morning.

Working days lost1.5
Linked programme task2.1 Substructure, progress 62%

Questions

Before you message.

How often do we measure?

Weekly by default. Biweekly, monthly and custom periods are supported, one entry per item per period.

Can a measurement exceed the contract quantity?

No. The entry is rejected. Variations are handled in the BOQ, not by over-measuring.

Who can verify an entry?

A PM or QS with edit rights on the BOQ. Verified entries are locked until the PM removes the verification.

Stop finding out at month end. Know on Monday.